Lead Forensics
Home » 6 big losses
Our Address
Unit 9 Harvington Business Park, Brampton Rd, Eastbourne, BN22 9BN, UK
Need Help?
We aim to reply to email enquiries within 20 minutes (during normal working hours).
CD Automation UK Limited © Copyright 2026. All Rights Reserved.

Thanks for your submission!

What happens next?

This isn't an automated product-selection tool.

One of our team will look at the information you've provided and review the application from an engineering point of view.

We may come back with a few questions, but we'll normally be looking at things such as:

  • The type of electrical load
  • Supply and current requirements
  • The most appropriate firing method
  • REVO-S, REVO-C or multi-loop architecture
  • Diagnostics and monitoring requirements
  • PLC and communications
  • Opportunities to simplify the design
  • Future machine standardisation

No lengthy specification needed.

Just give us enough information to get the conversation started.

Prefer to talk?

Call us on 01323 811100

CD Automation UK

Industrial power control. Backed by people who understand the application.

Please send me this document

🎉 Thank you! Your download is ready.

You can access your PDF now by clicking the link below:
Inside, you’ll discover the 5 common mistakes that can affect machine performance and how to avoid them to save time, reduce downtime, and improve product quality.

🎉 Thank you! Your download is ready.

You can access your PDF now by clicking the link below:
This paper explores how integrated thyristor power and temperature
control improves heating consistency, energy efficiency, and reliability,
helping UK manufacturers reduce downtime, extend equipment lifespan,
and shift from reactive to predictive maintenance.